Steel GI pipe class b class c (galvanized pipe)

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-02 19:41

  • Browse the number:

    218

Send an inquiries
+
Tianjin Brilliant International Steel Co. Ltd
Contactaixin:

Contactaixin:

brilliantsteel(Mr.)  

telephone:

Area:

Beijing

Address:

Building the Village of Baoxiang, Rhubarb, Wuqingqu, Tianjin, China (301800)

Website:

http://brilliantsteel.travel-adapter.net/

+
Model Number: Jess-GI pipe-003 Brand Name: Brilliant Key Specifications/Special Features: Brilliant group galvanized steel pipe:Products details: Place of origin: Tianjin, China (Mainland)Grade: Q195-Q345, Q195, Q215, Q235, Q345Application: structure pipe, machinestructure, building and construction and more
  • Alloy or not: non-alloy
  • Size OD:1/4" -24" (5.0mm-716mm)
    Wall Thickness:0.5mm-7.5mm
    Length:5.8m, 6m, 11.8m
    Steel material Q195 → SS330,ST37,ST42
    Q235 → SS400,S235JR
    Q345 → S355JR,SS500,ST52
    Standard ASTM A53/Grade A/B, BS1387-1985, BS EN 10219: 2006,ISO 65-1981,JIS G444:2004 STK400
    Zinc Coating 120g/m2(20m),270g/m2(40m),400(60m),500(70m),550(80m)
    Usage 1)low pressure liquid, water, gas, oil, line pipe
    2)construction
    3)fence, door pipe
    Ends 1) Plain
    2) Beveled
    3) Thread with Coupling or cap
    4) Chamfer
    5) Groove
    6) Screw
    End Protector 1) Plastic pipe cap
    2) Iron protector
    Surface Treatment 1) Bared
    2) Black Painted (varnish coating)
    3) Galvanized
    4) Oiled
    5) PE, 3PE, FBE, corrosion resistant coating, Anti corrosion coating.
    Technique Electronic Resistance Welded (ERW )
    Electronic Fusion Welded (EFW)
    Double Submerged Arc Welded (DSAW)
    Welded Line Type Longitudinal
    Section Shape Round, Round, Square, Rectangular
    Inspection With Hydraulic Testing, Eddy Current , Infrared Test
    Package 1) Bundle
    2) Bags
    Delivery 1) Container
    2) Bulk carrier
    Delivery Time 7-15working days
    Shipping Information:
    • FOB Port: China (Mainland)
    • Lead Time: 7 - 15 days
    Main Export Markets:
    • Asia
    • Australasia
    • Central/South America
    • Eastern Europe
    • Mid East/Africa
    • North America